loading

SAMZOON focuses on the research and production of modular custom sandwich panels.

Honeycomb Purification Panel: Handling & Installation Guidelines

📦

Incoming Inspection for Honeycomb Purification Panel

After honeycomb purification panel arrives at the construction site, perform a full visual inspection first. Check metal surfaces for scratches, dents, coating peeling and deformation. Verify panel dimension, honeycomb core specification, surface coating type and full edge sealing status according to purchase contract. Randomly take samples of honeycomb purification panel to check bonding quality between metal skin and honeycomb core. Tap the panel surface evenly; hollow sound indicates incomplete bonding. Reject honeycomb purification panel with poor adhesion, unsealed core or surface warping. For GMP cleanroom projects, ask for finished product test documents together with the goods. Damaged panels should be marked and isolated, not allowed for cleanroom construction.

🌤️

On-site Storage Key Requirements

Honeycomb purification panel has a rigid but fragile edge structure. Store honeycomb purification panel indoors in dry, dust-free and ventilated space. Never stack panels outdoors exposed to rain, dew and direct sunlight. Place moisture-proof padding under stacked honeycomb purification panels. Keep panels flat, do not stand them upright for long time to prevent permanent bending deformation. Separate each panel with protective film, avoid hard objects pressing on panel surface. Do not remove the protective film before installation. Keep honeycomb purification panel away from welding sparks and high-temperature heat sources.

✂️

Cutting and Edge-sealing Treatment Rules

Honeycomb purification panel requires precise cutting with sharp professional tools. Avoid rough cutting which causes core collapse and micro cracks on edges. Complete cutting work indoors if possible. Prevent dust and moisture from entering the honeycomb cells during cutting. Full edge sealing must be carried out immediately after cutting. Unsealed honeycomb holes will absorb moisture, accumulate dust and lead to core contamination, delamination or particle release in cleanrooms. Clean all foam and aluminum debris from the cut cross-section before sealing. Minimize unnecessary drilling on honeycomb purification panel; all drilled holes must also be fully sealed after processing.

🔧

Core Installation Operation Points

Handle honeycomb purification panel gently during lifting and assembly. Prevent collision impact on panel corners and edges, which are easy to crack and collapse. Set keel spacing strictly according to mechanical parameters of honeycomb purification panel. Excessively large keel spacing will cause panel bending and uneven surface. Control panel joint gaps evenly, use compatible cleanroom sealant for joint filling. Ensure seamless, smooth surface to prevent dust accumulation. Isolate welding sparks during cross-construction to avoid burning panel coating. For large continuous wall surfaces, reserve proper expansion joints to release thermal stress.

Post-installation Acceptance Check

After honeycomb purification panel installation, inspect all cut edges, drilled holes and panel joints one by one to confirm all sealing is intact. Check the overall wall flatness, no warping, hollowing or edge cracking. Wipe the panel surface and check for particle shedding. Verify the sealing condition to meet GMP cleanroom requirements.

🏭 As a Foshan local source manufacturer, SAMZOON is familiar with GMP cleanroom acceptance standards. We provide customized honeycomb purification panel, urgent production and free sample service. Our technical team offers on-site construction guidance to reduce common construction defects. A large number of South China pharmaceutical and laboratory purification project cases can be checked for reference. The flatness and cleanliness performance of honeycomb purification panel rely heavily on proper site operation. Strict incoming inspection, flat dry storage, instant edge sealing and standardized installation are essential to avoid core contamination, edge damage and GMP acceptance failure.

prev
PIR Sandwich Panel: PIR vs PU Core Comparison
recommended for you
Get in touch with us

Adhering to the enterprise vision of "becoming a leader in the clean room subdivision industry and a clean production environment service provider for enterprises", we will make a contribution to the society.
Contact Us
Contact person: Sophy Lu, Dana Yuan
Tel: +86 13929181826, 13928784893
4000708399
WhatsApp: +86 18319613259
E-mail: lsm576@fssamzoon.cn, yuki@fssamzoon.cn
Add: No.6 Herui Road, Lubao Town, Sanshui Area, Foshan City, GD Province, China
Customer service
detect